[http://www.bogercityfire.org/nav.htm]
 
Rubbish Fire Next To Building
On Aug. 6, Boger City Fire was dispatched along with Lincolnton Fire on a possible structure fire at Belding Hausman on East Main St. in Boger City. Engine 41 arrived first to report heavy smoke coming from the rear of the structure. E41 caught a hydrant and proceeded to the rear of the building. E41's crew found a pile of trash and debris piled on fire beside the structure. Foam and water along with a mini-backhoe were used to extinguish the burning roofing products and Styrofoam. Two extra departments were called in due to the high heat. Crews remained on scene for close to 3 hours. One firefighter was transported to CMC Lincoln for heat exhaustion, he was treated and released. The fire reportedly started from a piece of machinery being used for demolition. Units that responded were E41, Rescue 46, E1, L1, Car 420, Car 2, Car 3, Sq107, Car70.
Photos provided by Ron McCann.

001 001-(1) 001-(2) 001-(3)

Back to Fire Photos
 
[http://www.bogercityfire.org/footer.htm]